Upgrading an epoxy resin facility

Upgrading an epoxy resin facility

Our client required their existing facility completely transformed to strengthen their epoxy resin production, this included removing outdated equipment and upgrading existing systems, equipment and pipework.

Appointed as the Principal Contractor, BGEN were assigned to deliver mechanical, electrical, instrumentation, and installation services, including fabrication and supply of all steelwork and pipework.

Our Solution

In response to the client’s requirement, BGEN implemented a comprehensive solution that seamlessly integrated various components into the facility. A solution that was meticulously crafted to address the specific operational and safety challenges while optimising space and ensuring structural enhancements.

With limited space, structural changes were required to accommodate new vessels and other elements. This included the erection of new stanchions, columns, and frames to offer structural integrity. A mezzanine, secondary platform, and access staircases were all installed to ensure efficient utilisation of the available space, as a result effectively increasing operational capacity. They were complimented by insulation measures to improve energy efficiency and ensure product containment in case of unforeseen incidents.

Over 100 items were installed including vessels, pumps and filters supported by a remarkable 30,000 meters of electrical and control cables, 32,000 meters of instrumentation cables, deployment of 6,650 meters of stainless steel and carbon steel, and 350 meters of Galvanized steel. All are complimented by fabrication, galvanization, and installation of an impressive 5,656 pipe supports.

BGEN executed each phase of the project with precision, encompassing mechanical and electrical works and structural enhancements, ensuring a seamless and efficient execution whilst maintaining safety and compliance with industry standards and stringent safety regulations. Now the client benefits from a state-of-the-art facility fully compliant to support the production of epoxy resin.

Client Benefits

  • A single point of contact: to manage the project from start to finish and ensure it’s delivered on time and to the design specification.
  • Improved facility: The upgraded facility improves safety for both products and personnel and provides streamlined processes and increased productivity, effectively addressing the operational requirements of our client.
  • Space optimisation: The creation of mezzanines, secondary platforms, and access staircases optimised the facility’s use of space, seamlessly accommodating new vessels and tanks.
  • Energy Efficiency: The cladding and insulation measures contributed to improved energy efficiency, ensuring cost-effective operations.
  • Structural Integrity: The new stanchions, columns, and frames ensured the structural integrity of the extension, meeting the demands of the epoxy resin production train.

  • Share on LinkedIn

Get in touch

Whether you have a specific project in mind or would like to explore how we might work together in future, please just contact us.

    * Fields are required

    This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.